Formerly the Manchester Royal Eye Hospital, Citylabs is the new 100,000 sq ft bespoke-built biomedical centre of excellence which is located on Oxford Road in Manchester, at the heart of Europe’s largest clinical and academic campus, made up of Central Manchester University Hospitals NHS Foundation Trust and The University of Manchester.
SES Engineering Services (SES) won the £5.6m M&E contract which included category A works to tenant areas and a full category B fit out for a 60-bed medical research facility.
To deliver this prestigious project at the heart of Europe’s largest clinical and academic campus, a critical element of SES’ offering was the ability to deliver substantial time, labour and cost savings through its market-leading prefabrication arm, Prism.
Prism played an integral part in the delivery of this project using 1,650m of pipework and a further 300m of primary ductwork and insulation. Prism delivered a prefabricated building complete with services – a job that would normally take 14 weeks was finished in a single day.
David Taylor, Project Manager, Manchester Science Partnerships commented:
“This new science and research hub in the heart of Manchester’s academic community is a significant advancement in the UK’s healthcare research and development sector. Not only will it provide a vibrant working space for users, it will enable tenants to remain at the forefront of biological innovation.”
Other Case Studies
University of Hull
As the student accommodation sector continues to be a source of new work for leading national engineering specialist SES Engineering Services (SES) who were appointed by main contractors Sewell Construction completed a £6.5m contract at the University of Hull.
Leeds students benefit from fantastic £80m creative arts building
Leading engineering specialist, SES Engineering Services (SES), has announced the completion of MEP works on the impressive Creative Arts building in Leeds City Centre, which has a development value of £80m.
GSK Aseptic Manufacturing Facility - Q Block
SES worked to a detailed schedule of works to install all mechanical and electrical (M&E) building services, ensuring that there was minimum disruption to the live manufacturing site which completed in January 2020.