Due to complete in 2026, the landmark commercial office development in London Bridge for EDGE Technologies is set to be London’s most sustainable office building, setting new standards for intelligent office spaces in the UK.
Appointed by longstanding partner, Mace, SES will deliver the full MEP shell and core services, using our expertise to deliver a state-of-the-art, sustainable, and occupant-focused smart building.
The 28-story tower is EDGE’S first in the UK and is set to achieve BREEAM Outstanding, WELL Platinum certification and exceeding RIBA energy-use targets set for new buildings for ‘Paris Proof’ occupation. To achieve the goal of delivering their first Net Zero project, EDGE London Bridge will use renewable materials such as timber, circular economy principles, materials reuse and recycling, and renewable energy.
The pioneering development will be instrumental in achieving EDGE’S goal to produce better buildings based on its four pillars; Sustainability, Wellbeing, Design and Technology.
We are currently on site carrying out preconstruction activities including detailed design, procurement, Design for manufacture and assembly (DFMA) and collaborating with Mace to find the most optimum build solutions. We are also working closely with our offsite manufacturing team to maximise our offsite solutions for this scheme.
Other Case Studies

GSK Aseptic Manufacturing Facility - Q Block
SES worked to a detailed schedule of works to install all mechanical and electrical (M&E) building services, ensuring that there was minimum disruption to the live manufacturing site which completed in January 2020.

Teesside Energy Centre
SES Engineering Services (SES) was appointed to design, install and commission the mechanical, electrical and plumbing (MEP) services on Teesside Energy Centre which was constructed by a consortium between Lagan Construction and Babcock & Wilcox Vølund (BWV).

Gasholders London
Set in King’s Cross – one of the largest areas of central London to be developed in the last 150 years – the circular Gasholders London project is a pioneering example of cutting-edge offsite manufacturing and prefabrication.